Industrial construction Chișinău and Moldova.
Industrial construction in Chișinău and across Moldova. We build turnkey metal halls: we design the structure, help you get the permits and put the building up quickly. Production halls, logistics centres and warehouses go up on metal structures calculated to Moldova's seismic codes.
Technical support: RO / RU
Leave a request
The data is processed in line with the privacy policy.
Construction Solutions
We choose the load-bearing structure and the cladding, sandwich panels or corrugated sheet, to suit what the building will be used for. A hall can have any span: we build production workshops as well as large logistics centres.
Production Halls
Heavy metal structures calculated to carry overhead cranes and large industrial machinery. We choose the sound and thermal insulation to suit the production process.
Warehouses & Logistics Centres
Spans of up to 30 m with no intermediate columns, so forklifts can manoeuvre easily. The quartz-hardened, power-floated industrial floor stands up to heavy traffic.
Cold Storage
For farming and the food industry. We use PIR/PUR foam sandwich panels of 100-150 mm, which leave no thermal bridges and keep the cold in with less energy.
Mixed Administrative Buildings
We build offices on a metal frame directly into the body of the production hall, with facades in structural cassettes or curtain walling.
Your Project's Roadmap
Building a hall in Chișinău means getting through the paperwork as well as the concrete and steel. We work in four steps.
- 1
Assessment & Feasibility Study
We visit the plot and look at what the building will be used for and how machinery will get in. We set the span of the hall, the type of foundation and the estimated budget, starting from the load calculation.
- 2
Design & Local Bureaucracy
This is where most investors get stuck. We prepare all the technical documentation and help you obtain the urban planning certificate and the building permit from Chișinău City Hall.
- 3
Foundation & Fabrication
To save time, we work in parallel: on site our crews pour the footings and prepare the foundation, while the columns, beams and bracing are fabricated and primed in the workshop.
- 4
Fitting & Turnkey Handover
We assemble the structure with high-strength bolts, with no welding on site. We fit the sandwich panels, the rainwater system and the industrial doors, pour the power-floated floor, and finish with commissioning.
We Build for Moldova's Real Conditions
We have built dozens of halls in the Muncești, Uzinelor and Petricani industrial zones, in the suburbs of Chișinău (Stăuceni, Vatra, Sîngera) and across Moldova. We know the local soil and how the local authorities work, and we calculate structures for the snow loads and seismic rating of our region. We don't sell steel by the kilogram: we hand over safe industrial buildings ready for use.
Cost Transparency
We calculate the final cost after the design stage. Until then, these are the usual budgets on the Chișinău market:
Uninsulated Hall (Cold)
The price includes the insulated foundation, the metal structure, corrugated sheet cladding and a basic industrial floor. It suits a garage for machinery or a store for goods that don't mind heat or cold.
Insulated Hall (Sandwich Panels)
The price includes the foundation, a structure calculated for the extra weight, PUR/PIR panel cladding (80-100 mm) and a quartz-hardened power-floated floor. This is how production and logistics halls are usually built.
Factors that change the final price:
- The hall's span: a hall wider than 20 m with no columns in the middle needs massive beams, and so more steel.
- The plot's geology: weak soils, common in some suburban areas, need deeper foundations or piles.
- The panel thickness: industrial cold stores need panels at least 120-150 mm thick.
Frequently Asked Questions
How long does it take to build a 500m² metal hall?
Once the foundation is poured, fabricating and fitting the structure with the sandwich panels takes about 40-50 working days. The paperwork in Chișinău can add 1-2 months before work starts.
Do you handle obtaining the urban planning certificate?
Yes. We prepare the project sketches and the documents for the file submitted to the Architecture and Urban Planning Department of Chișinău City Hall, and guide you through the whole procedure.
What kind of guarantee do you offer?
Under the construction regulations of the Republic of Moldova, the load-bearing structure carries an extended guarantee of up to 50 years. For the cladding, the roof and the waterproofing, the guarantee in the contract is usually 3-5 years, depending on the materials chosen.